We show the owner name because it appears on the deed. We do not offer search by a person’s name.
| Date | Price | Instrument | Grantor → grantee | Qualified |
|---|---|---|---|---|
| 23 Nov 2020 | $1,240,000 | 2020505921 | SERVAIS JEROME TRUSTEE → SHAW SCOTT | Qualified |
| 13 Nov 2017 | $1,275,000 | 2017458336 | JACKSON DANIEL W → SERVAIS JEROME TRUSTEE | Qualified |
| 31 Jul 2014 | $1,150,000 | 2014257496 | WILSON JEFFREY L → JACKSON DANIEL W | Qualified |
| 15 Dec 2006 | $100 | 2006594711 | WILSON JEFFERY L → WILSON JEFFREY L | Unqualified |
| 11 Apr 2001 | $220,000 | 2001121261 | APOLLO CAY CORPORATION → WILSON JEFFERY L | Qualified |
| 01 Dec 1984 | $2,776,700 | 04475/0247 | — | Unqualified |
| Permit | Type | Description | Valuation | Date | Status |
|---|---|---|---|---|---|
| HC-BLD-26-0083522 | Residential Building Alterations (Renovations) | Residential Renovation in Kitchen/Dining as well as upstairs Bathroom includes the following: -Removal and disposal of existing kitchen cabinets, building and installing new cabinets. - Frame Kitchen Archway Leading to the Dining Room - Create and Frame an Opening For a Glass Window In the Dining Room Wall. -Install Kitchen Faucet and Hook up Sink - Install Air Switch - Install Dishwasher - Cap Gas Line at Range After Demo - Shift Existing Ice Maker Line Up to 2 Feet - Remove 2 counter receptacles on the peninsula - Remove disposal switch and add a setup for an air switch (air switch by others) Includes a replacement of a QO breaker for a ARC/GFCI breaker - Add a receptacle for the dishwasher inside the cabinet for the sink and install a dual function breaker for protection - Installation of 2 customer provided pendants above peninsula - Abandon Oven 40amp wiring and run a new circuit for the range 50amp with a GFCI breaker. - Reinstall cs clock and connect to 120v - Remove switch next to fridge also cat 5 and add a receptacle, use existing power - Add led tape light under cabinets next to the stove. About 10ft 5000k color with diffuser rail. - Add a new circuit for the microwave with a dual function breaker. - Provide and replace 2 QO breakers for dual function to meet code requirements for the kitchen receptacles. -Electrical Work In Dining and Nook Area: - Relocate switch for cabinet lights and receptacle in dining room. - Relocate switch for dining chandelier, kitchen 3w for cans, switch for pendant. - Relocate dining chandelier switch. - Add a switch and 2 wall mount setup for wall by nook. - Install customer provided wall mount light fixtures on the hallway by nook. - Remove recess by dining and use the switch for upper cabinet lights so they are separate top and bottom. - Add 8 hockey pucks for inside cabinet in dining. 5000K color for hockey puck lights lighting. Upstairs Bathroom: - Build and install custom vanity - Install new base boards and casing - Frame New Wall Locations - Installation of New Cement Board at Shower - Installation of Shower Tiles - Installation of Main Floor Tiles Electrical Upstairs Bathroom : - Relocation of Existing 3-Way Switch - Replacement of Existing Shower Light - Addition of 3 General Area Recessed Light Fixtures - Installation of Wiring for 2 New Wall Sconce Locations on Either Side of the Vanity - Relocation of 3 Existing Switches - Vanity, Fan, and Shower Light - Remove and Replace Existing Exhaust Fan (Labor Only) - Provide Panasonic Exhaust Fan (Ultra Quiet) - Installation of 2 Customer Provided Wall Sconces at New Locations on Either Side of Vanity - Relocation of Existing Fan/Light Switch on Bedroom Side to Accommodate New Design - Relocation of Existing Receptacle on Bedroom Side to Accommodate New Design - Installation of 2 Dimmer Switches for Bathroom Lights -- The shower is going to remain in the same place it currently is, however the current setup is tub/shower combo. This will be converted to a shower only with controls, a showerhead, and a handheld sprayer. - The drain is to be relocated from the tub drain location to the center of the shower. - The toilet is going to be relocated to where the closet entrance currently is (subfloor to be removed by others as part of the demo.) - Installation of toilet. - The vanity plumbing is to be relocated next to th | $166,293 | 15 Jun 2026 | Issued |
Valuation is published for unincorporated county permits but not by the City of Tampa, which carries it on none of its permit layers — so the column is filled for some rows on the same parcel and not others. Contractor is published by neither. We show what each jurisdiction gives rather than estimating the rest.
No arrest records, no booking photographs, anywhere on this site.
| Address | Sold | Price |
|---|---|---|
| 5909 MENORCA LN | 19 May 2025 | $1,175,000 |
| 1423 JUMANA LOOP | 08 Apr 2025 | $1,200,000 |
| Section | Dataset | Publisher | Legal basis | Last fetch |
|---|---|---|---|---|
| Ownership, value, sales | parcel + allsales extract | Hillsborough County Property Appraiser | Ch. 119 public record | 05 Sept 2026, 03:46 |
| Recorded documents | Daily official records index (D / P / M) | Hillsborough County Clerk of Court | Ch. 119 public record | 05 Sept 2026, 03:01 |
| Permits | PermitsAll + Construction Inspections | City of Tampa GeoHub | Open data portal | 05 Sept 2026, 03:51 |
| Around here | Calls for service (JSON) | Tampa Police Department | Ch. 119 public record | 05 Sept 2026, 10:02 |
| Coming up | Legistar matters / events API | Hillsborough · Pinellas | Public API, no key | 05 Sept 2026, 06:15 |
| Code enforcement | — | Hillsborough County · City of Tampa | No dataset published | Request open |
Source data carries errors and we inherit them. If this is an address exempt under Fla. Stat. § 119.071(4)(d) — law enforcement, judges, prosecutors, survivors of domestic violence — we suppress the parcel within 48 hours, no questions asked.
Built in Tampa from Florida public records under Chapter 119 and Art. I § 24. No mugshots. No search by a person’s name. No arrest records tied to individuals. Police calls are shown by block, never against a home.