We show the owner name because it appears on the deed. We do not offer search by a person’s name.
| Date | Price | Instrument | Grantor → grantee | Qualified |
|---|---|---|---|---|
| 18 Jun 2007 | $1,710,000 | 2007279802 | MARIANI TIMOTHY K TRUSTEE → AA PROPERTIES-TAMPA LLC | Qualified |
| 18 Jul 2005 | $100 | 2005439419 | MARIANI GEORGE E → MARIANI TIMOTHY K TRUSTEE | Unqualified |
| Permit | Type | Description | Valuation | Date | Status |
|---|---|---|---|---|---|
| HC-BLD-26-0083033 | Commercial Building Alterations (Renovations) | Electrical Scope of Work for eProducts Addition to Asphalt Plant: 1. Install 1200A service from utility xfmr to MDP (MDP1). 2. Install MDP1. 3. Install MCC (MCC1). 4. Install 1200A feeder from MDP1 to MCC1. 5. Install cable tray system as raceway infrastructure. 6. Install o/h and u/g conduits for feeder and branch circuits for/Install branch circuit and feeder cable for: a. 480/3 Motors: 150hp - 1 ea.; 60hp - 2 ea.; 50hp - 1 ea.; 40hp - 1 ea.; 30hp - 2 ea.; 25hp - 1 ea.; 20hp - 2 ea.; 15hp - 5ea.; 10hp - 1 ea.; 5hp - 1 ea.; 3hp - 1 ea.; 1.5hp - 1 ea.; & 1hp - 2 ea. b. Local Control Panels - 2 ea.; c. 75kva 480 delta:208Y/120 xfmr. - 1 ea.; d. 45kva 480 delta:208Y/120 xfmr - 1 ea.; e. 225A 208Y/120 volt Panel LP1 - 1 ea.; f. Area Lighting from Panel LPI - 1 lot; g. Lighting Contactor and Control Element - 1 ea.; h. 250 amp feeder to existing Mill Bldg. 480/3 panel with provisions to add neutral conductor - 1 ea.; i. 250 amp feeder to existing GTR 480/3 panel with provisions to add neutral conductor - 1 ea.; j. Lighting from Panel HV1 ( that is located in MCC1) - 1 lot; k. Heat Trace Zone Power - 8 ea.; and l. local stop-start control stations - 11 ea. 7. Install electrical system grounding. | $816,701 | 23 Jun 2026 | Issued |
| HC-BLD-25-0073020 | Commercial Miscellaneous | Client is proposing to demolish and reposition (5) tanks on-site, install new foundations for these tanks, install a containment wall and a landing pad foundation for tank trucker access. There is only 220 SF of new impervious proposed for the blow-down tank foundation. storm water will tie into their existing storm water system . No work within the R/W No trees on-site Tallest tank to be 32' in height | $3,000,000 | 21 Aug 2025 | Complete |
Valuation is published for unincorporated county permits but not by the City of Tampa, which carries it on none of its permit layers — so the column is filled for some rows on the same parcel and not others. Contractor is published by neither. We show what each jurisdiction gives rather than estimating the rest.
No arrest records, no booking photographs, anywhere on this site.
| Section | Dataset | Publisher | Legal basis | Last fetch |
|---|---|---|---|---|
| Ownership, value, sales | parcel + allsales extract | Hillsborough County Property Appraiser | Ch. 119 public record | 05 Sept 2026, 03:46 |
| Recorded documents | Daily official records index (D / P / M) | Hillsborough County Clerk of Court | Ch. 119 public record | 05 Sept 2026, 03:01 |
| Permits | PermitsAll + Construction Inspections | City of Tampa GeoHub | Open data portal | 05 Sept 2026, 03:51 |
| Around here | Calls for service (JSON) | Tampa Police Department | Ch. 119 public record | 05 Sept 2026, 10:02 |
| Coming up | Legistar matters / events API | Hillsborough · Pinellas | Public API, no key | 05 Sept 2026, 06:15 |
| Code enforcement | — | Hillsborough County · City of Tampa | No dataset published | Request open |
Source data carries errors and we inherit them. If this is an address exempt under Fla. Stat. § 119.071(4)(d) — law enforcement, judges, prosecutors, survivors of domestic violence — we suppress the parcel within 48 hours, no questions asked.
Built in Tampa from Florida public records under Chapter 119 and Art. I § 24. No mugshots. No search by a person’s name. No arrest records tied to individuals. Police calls are shown by block, never against a home.